Tuesday, September 1, 2015

Day 32: LAMP Project Delayed

Today had to be a complete failure. I overslept and got in there late, which doesn't matter this week because this is project week and the instructors have stopped lecturing so we'd have complete freedom to get our LAMP stack projects going. CB was the point man for our project and with him sick we were in complete disarray over how to approach everything. We spent the entire morning trying to figure out a problem on Github and after the two other guys took off for sports and lunch. I was left alone and with no idea of what to do next I decided to work on the Red Belt exam. I took a brief brake for some cheap lunch and then resumed. By the time they got back they caught me working on the exam instead of doing any work, which I was a little embarrassed of but then again I really had no idea what I should be doing. After we got sorted out they told me to work on the controllers for the pages I'm working on. I sat down to get to it but again I was caught up on trying to make Github work. For some reason our project doesn't recognize me as a contributor. The two guys decided to leave early today and after they left I gave up and went back to the Red Belt exam. I am glad to finish it. The first time I took the exam I had option C, the second time I had option A, I hope that on Friday I would get option B. Otherwise this had all been just practice.

After that I left early too.

No comments:

Post a Comment